888-561-8477

Union Safety Consulting LLC
Union Safety Consulting LLC
  • Home
  • Services
  • Policy
  • Contact Us
  • About Us
  • Our Work
  • More
    • Home
    • Services
    • Policy
    • Contact Us
    • About Us
    • Our Work

888-561-8477


  • Home
  • Services
  • Policy
  • Contact Us
  • About Us
  • Our Work

About Us

AT USC


Operating a company safely requires engaged leadership and a strong culture to identify and manage operational risks. USC has been providing solutions to complex health and safety issues for over 20 years. Our approach is simple: maximize the safety investment with a sustainable approach to deliver performance excellence.

USC understands that each of our clients is unique and requires custom solutions that fit with leadership’s goals and company culture. We work closely with our clients to understand your needs and objectives in order to develop the right approach for both immediate and sustainable results. Whether your company is in its initial phases of implementing a safety program or has a mature safety program and looking to advance the next level of safety excellence, USC is here to support your vision.

​

Purpose

Construction personnel performing demolition work are exposed to many hazardous conditions and materials. Although a contractor may be concerned about employee safety, there should also be heightened awareness for the safety of the general public and the property of others.

​

Policy

All company employees, contractors and subcontractors must follow the requirements of this program during all demolition projects. This program outlines control measures contractors must implement as part of their existing program to plan for a successful and safe demolition project. Those supervising demolition activities should be familiar with the OSHA 29CFR1926, Subpart T, and all state and local requirements that apply to demolition work.

​

Demolition Safety Requirements

  • All contractors adhere to safe work practices. Before beginning any demolition work, an Engineering Survey Report is required. Once demolition work has started, there will be additional safety requirements for various activities. A Competent Person is required to conduct the Engineering Survey prior to beginning any demolition work. The purpose of the Engineering Survey is to thoroughly evaluate the project to identify potential hazards and develop controls to prevent accidents. Potential hazards include:
    • Occupational Health Hazards.
    • Cave-ins.
    • Explosions.
    • Premature Collapse.
    • Fire.

Contractors must have written evidence that an Engineering Survey was conducted, and retain that report on-site.

For contractors that perform demolition work on an infrequent basis, it is recommended that a Safety Consultant’s services be contracted for the demolition work.

All personnel involved in demolition work should be briefed on the ANSI A10.6. Safety Requirements for Demolition.


If hazardous materials are found, responsibilities should be assigned to the appropriate contractor(s) for removal & disposal of the materials.

• Asbestos & other materials may be in furnaces, reactors, boilers, insulation, other fire protection materials, certain types of floors and ceiling tiles.
• Lead may be in pipe systems & with lead based paints.
• Polychlorinated biphenyls may be in electrical systems such as transformers & capacitors.

​

Work Progression

Except for cutting holes in the floors for chutes, holes to drop materials through, preparation of storage space & similar preparatory work, the demolition of floors and exterior walls shall begin at the top of the structure and proceed downward.
Each story of exterior wall & floor construction shall be removed & dropped into the storage space before commencing the removal of exterior walls & floors in the next story below.
Hazards to anyone from the fragmentation of glass shall be controlled.
Mechanical equipment shall not be used on floors on working surfaces unless such floors or surfaces are of sufficient strength to support the imposed load.
Employee entrances to multistory structures being demolished shall be protected by sidewalk sheds, canopies or both. Protection shall be provided from the face of the building for a minimum of eight (8) feet. All such canopies shall be at least two (2) feet wider than the building entrances or openings and shall be capable of sustaining a load of 150 psi.
Only those stairways, passageways & ladders designated as means of access to the structure shall be used. The designated means of access shall be indicated on the demolition plan. Other access ways shall be indicated as Not Safe for Access & closed at ALL times. The stairwell shall be covered at a point no less than two (2) floors below the floor on which work is being performed. Access to a floor where work is in progress shall be through a separate lighted, protected passageway.
During demolition, continuing documented inspections by a competent person shall detect hazards resulting from weakened or deteriorated floors, walls, or loosened material. NO employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing or other means.

​

Debris Removal

Any chute opening into which debris is dumped shall be protected by a guardrail 42 inches above the floor or other surface on which personnel stand to dump the material. This also applies to any space between the chute & the edge of openings in the floors through which the debris will pass.
When the debris is dropped through openings in the floors without chutes, the openings and the area onto which the material is dropped shall be enclosed with barricades not less than 42 inches high and not less than six (6) feet back from the projected edge of the opening above.
Signs warning of the hazard of falling materials shall be posted at EACH SIDE of the debris opening at each floor.
Debris removal shall not be permitted in lower areas until debris handling ceases on the floors above.
All material chutes, and sections that are at an angle of more than 45 degrees from the horizontal shall be enclosed, except for openings equipped with closures at or about floor level for the insertion of materials.
The openings shall not exceed 48 inches in height measured along the wall of the chute.
Such openings, when not in use, shall be kept closed at all floors below the top floor.
A substantial gate shall be installed in each chute at or near the discharge end.
7.4.1 A competent employee shall be assigned to control the operation of the gate, and the backing & loading of trucks.
When operations are not in progress, the area surrounding the discharge end of a chute shall be closed.
Where material is dumped from mechanical equipment or wheelbarrows, a toeboard or bumper, not less than 4 inches thick and 6 inches high, shall be attached at each chute opening.
Chutes shall be designed & constructed of such strength as to eliminate failure due to impact of materials & debris loaded therein.
The storage of waste & debris on any floor shall not exceed the allowable floor load.
In buildings having wood floor construction, the floor joists may be removed from not more than one floor above grade to provide storage space for debris, provided falling material is not permitted to endanger the stability of the structure.
When wood floor beams serve to brace interior walls or free-standing exterior walls, such beams can be left in place until other support can be installed to replace them.
Floor arches, to an elevation of not more than 25 feet above grade, may be removed to provide storage area for debris provided such removal does not endanger the stability of the structure.
Storage space to which material is dumped shall be blocked off, except for openings for the removal of materials, and such openings shall be kept closed when material is not being removed.
Floor openings shall have curbs or stop-logs to prevent equipment from running over the edge.
Any opening cut in the floor for the disposal of materials shall be not longer than in size than 25% of the aggregate total floor area, unless lateral supports of the removed flooring remain in place. Floors weakened or otherwise made unsafe by demolition shall be shored to carry safely the intended imposed load for demolition.

Purpose of Union Safety Consulting:

Our purpose at USC is to provide our clients with the highest level of safety consulting services. We aim to assist our clients in identifying and managing operational risks while enhancing their overall safety culture. Our team of experts works closely with our clients to understand their unique needs and objectives, and develop custom solutions to achieve their safety goals. We are committed to delivering sustainable, measurable results that help our clients achieve performance excellence and maintain a safe work environment.

WE BELIEVE IN SAFETY FOR EVERYONE


Chinese Proverb

Copyright © 2023 Union Safety Consulting LLC - All Rights Reserved.

Powered by

  • Services
  • Policy
  • Contact Us
  • About Us
  • Our Work

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept